Temporary Flood Protection - terra stop log system

DRESDEN-GHOLIS FLOOD PROTECTION SYSTEM

DRESDEN-GHOLIS FLOOD PROTECTION SYSTEM.

In the years 2002 and 2013, the Gohlis district of Dresden was completely flooded by the river Elbe. To permanently protect this part of town, we installed a complete flood protection system which at the same time provides access to the meadows along the Elbe.

On sheet piling with a foundation of drilled piles, a massive concrete and stone wall was erected, fitted partly with demountable 200 x 100 tk stop logs. These have to withstand very high impact loads – up to 50 kilonewtons per 50 x 50 centimeters. In accordance with DIN 19712, double closures were provided for crossings and passages. The protective wall is around 880 meters long, with barrier heights of 2 meters and 0.60 meters.

To store the demountable flood protection system, we designed special pallets that can be loaded and unloaded using a forklift truck, wheeled loader, or mobile crane.


you might also be interested in

  • Raising the banks of the Moritzbach in Zwickau

    In October 2015, the official handover of the flood protection system on the Moritzbach in the Pölbitz district of Zwickau took place. Protective walls were strengthened and raised on around 530 metres of the watercourse.


    To the post
  • Saxony-Anhalt is also battening down its hatches

    Since the “flood of the century” in 2002, Saxony-Anhalt has completed a whole range of flood defence measures, especially for upgrading dykes. One weak spot was the Elbtor alongside the River Elbe in Schönebeck.


    To the post
  • Foundation for first nuclear power plant in Bangladesh

    In Ruppur, about 180 kilometres west of the capital Dhaka, the first national nuclear power plant is to secure Bangladesh's energy supply from the end of 2023.