PIONEERING ACHIEVEMENT ON THE HIGH SEAS.
This marks the beginning of a new era in wind energy.
The first German wind farm, “alpha ventus”, has been built in 30 meters of water some 45 kilometers north of the island of Borkum. The 12 turbines of this wind farm, each with an output of 5 MW, will supply electricity for around 50,000 people. The intention is to install a total of up to 25,000 MW of power by 2020.
Foundation for transformer station
The foundation for the alpha ventus transformer station is made from four tubular steel piles, each approx. 40 meters long and weighing up to 110 tons. The combination of vibration and impact-driving enabled several conditions to be fulfilled.
After detaching the transport apparatus, the vibrator was mounted directly on the steel pile, thus holding and aligning it. Load distribution plates with two clamp grips are used to transfer the force of the vibrator to the pile. This dispenses with the need for an elaborate guiding frame and a tool to suspend the pile. That in turn saves space on the already very congested installation platform. A pile-mounted vibrator permits simple vertical installation and optimum driving time and is extremely cost-efficient.



you might also be interested in
-
Flood Protection in Fargo, North Dakota, USA
The city of Fargo is located on the Red River, which repeatedly flooded existing flood defences and roads during the winter months.
To the post -
New Embankment For Logport II in Duisburg
Due to the growing demand of the logistics industry, a new logistics center was established in the Port of Duisburg - Logport II. A new embankment was built over a length of 360m.
To the post -
The Wentworth Point Marinas Project
The Wentworth Point Marinas Project is made up of four apartment complexes with a combined worth of US$308.5 Million which will completely transform Wentworth Points foreshore.
To the post