STOKES HILL WHARF FENDER PILES.
MÜLLER MS32 HFV Crane suspended vibro and BSP CX110 Impact Hammer
terra infrastructure supplied both our müller MS32HFV vibro and BSP CX110 impact hammer to Advance Civil and Engineering to install 22 x 32m long fender piles on their Stokes Hill Wharf upgrade.
The piles were set with the vibro and back driven with the impact hammer to a depth of 6m into the sea bed.

you might also be interested in
-
Plastic Construction Road in Tübingen
For the protection of the hospital grounds, the company used the plastic construction road to optimally protect the paved access road to the installation site as well as the surrounding park and meadow areas.
To the post -
Clear view: glass panels in Neufelderkoog
Here, a flood protection barrier including glass elements protects the inhabitants and visitors from storm tides. The glass breaks up the appearance of the approximately 800 meters long flood defence wall.
To the post -
Brought in ice-cold.
Beim Einbringen von Stahlrohren in den Permafrostboden für den Hafen in Westsibirien kamen zwei Vibrationseinheiten MS-210 HHF und zwei MS-240 HHF zum Einsatz.
To the post