The Brandheide landfill is located on the city limits of Dortmund. It was used between 1959 and 1972 for the disposal of household waste, construction waste and tar sludge. To capture groundwater, the landfill was provided with an approximately 800-meter-long cut-off wall with sheet piles in lengths of up to 10.50 meters. To ensure long-term water protection, we executed the sheet pile walls with a coating on both sides and a durable interlock seal.

you might also be interested in
-
Protecting valuable history with terra stop log system
In a major project here in the hinterland of the Elbe, a combination of a new earth embankment and strengthening of the protective measures by means of demountable stop log elements has been realised.
To the post -
Pile Driving in Permafrost
The absolute advantage of our equipment under permafrost conditions: terra machines did not require any preheating, as they were already designed for the extreme conditions ex works.
To the post -
Flood Protection along the railway line in Minnesota
A railway line that crosses the Chippewa River, Minnesota is regularly affected by flooding and should be provided with flood protection.
To the post